Home
Download PDF
Order CD-ROM
Order in Print
RECEPTACLE INSTALLATION
Section 8. TRUNNION, LATCH, ECCENTRIC, AND RELATED PARTS
TM-9-1240-216-34 Periscope Tank: M19-Old and New Configuration M24-Old and New Configuration Manual
Page Navigation
100
101
102
103
104
105
106
107
108
109
110
TM
9-1240-216-34
4-24.
RECEPTACLE
INSTALLATION
(CONT)
Procedure
Step
Using
fingers,
put
center
leg
of
high
voltage
cable
assembly
(9)
into
receptacle
hole
(10).
7.
NOTE
FOLLOW-ON
MAINTENANCE
Install
cover
(para
4-15).
Do checkout procedure
(Vol
I,
para
2-2).
END
OF
TASK
Para
4-24
Cont
4-45
Vol II