TM 9-1240-382-34
CHAPTER 3
INSPECTION
CHAPTER OVERVIEW
This chapter contains a. general information, b. final inspection, and c. preembarkation inspection procedures.
SECTION I. GENERAL
3-1 SCOPE. This section provides specific instructions
function properly, if all modification work orders classified
for technical inspection of the periscope by direct support
as urgent have been completed, and if all defects
and general support maintenance personnel. In general,
disclosed by the inspection have been corrected, the
if the periscope is complete and performs its intended
periscope may be considered serviceable.
SECTION II. FINAL INSPECTION OF PERISCOPE
3-2 FINAL INSPECTION
This task covers:
Inspection
INITIAL SETUP
References
Applicable Configuration
None
All
Troubleshooting References
TM 9-2350-253-10
Test Equipment
TM 9-2350-253-202
None
Equipment Condition
Dioptometer 4931-00-536-5557
None
Materials/Parts
Special Environmental Conditions
None
None
Personnel Required
Approximate Time Required
1
See Maintenance Allocation
Chart (MAC) in TM 9-2350-253-20-2
LOCATION
ITEM
REMARKS
ACTION
INSPECTION
body assembly (2), and elbow assembly (3)
Periscope
Head Assembly,
must be complete with all screws, nuts and
washers in place and secured. Replace
Assembly, Elbow
missing parts. When looking through the
Assembly
periscope there shall be no evidence of
moisture or fungus growth, or damage to
Head Assembly (1)
windows or lenses. If moisture is present,
Elbow Assembly (3)
or physical damage is present, return to
depot for repair.
3-1