TM 9-1240-382-34
This task covers:
Purging and charging
INITIAL SETUP:
Applicable Configuration
Troubleshooting References
All
None
Test Equipment
None
Equipment Conditions
None
Special Environmental Conditions
Materials/Parts
None
General Safety Instructions
Personnel Required
None
1
Approximate Time Required
References
See Maintenance Allocation
TM 750-116
Chart (MAC) in
TM 9-2350-253-20-2
LOCATION
ITEM
REMARKS
ACTION
PURGING/CHARGING
Refer to TM 750-116 and
Periscope
Purging Screw (1)
Major
Purging Valve (2)
charging procedures as
Components
Elbow Assembly (3)
pertains to the M35E1
Purging Screw (4)
Periscope.
Purging Valve (5)
Body Assembly (6)
NOTE
Purging Screw (7)
Purging Valve (8)
The periscope shall be
Head Assembly (9)
purged and charged in
three
steps:
elbow
assembly;
body
assembly; and head
assembly.
2-30