TM 9-1240-401-34&P
2-13. CABLE ASSEMBLY MAINTENANCE INSTRUCTIONS
This task covers:
a. Disassembly b. Repair c. Assembly
References
Tool Kit, Electronic System, Repair, Field Main-
TM 9-254
tenance (SC5180-95-CL-B29)
Ml 46 telescope mount removed from howitzer
(TM 9-235-311-20-2)
Cable assembly removed from Ml 46 telescope
Gaskets (2) (Item 6, appx E)
Gaskets (2) (Item 7, appx E)
a. Dlsassembly
Remove machine screw (1) and shoulder pin (2)
and then remove plate (3) and receptacle shell (4)
as a unit.
Remove four machine screws (5) and four lock-
2
washers (6) from bushing insulator (7). Discard
Iockwashers.
3
Slide electrical shell connector (8) down cable (9)
away from angle bracket (10).
4
Unsolder cable leads from two lug terminals (11).
Remove gasket (12), angle bracket (10), and gas-
5
ket (13) from bushing insulator (7). Discard gasket.
6
Remove two lug terminals (11 ) from bushing insu-
lator (7) by removing two nuts(14) and two electri-
cal contacts (15).
7
Remove two insulation sleevings (16) from leads of
cable (9).
2-17