TM 9-1240-380-34
INFRARED BODY ASSEMBLY PURGING AND CHARGING
APPLICABLE CONFIGURATIONS: M36
TOOLS: 1/4" flat tip screwdriver
3/8" open end wrench
Fire control purging kit
SUPPLIES: Soap
PERSONNEL: One
REFERENCES: JPG 41C for purging and charging setup
EQUIPMENT CONDITION: Infrared body assembly on work bench
PRELIMINARY PROCEDURES: Do purging and charging setup (JPG)
High voltage. Make sure that rotary switch is set to OFF
before continuing.
DEATH
or severe injury may result if personnel fail to observe safety
precautions listed in Job Performance Guide 113-091-9000R.
Do not purge and charge infrared body assembly in bright
light. Prolonged exposure may cause damage to the image
converter tube.
Vol II