ARMY TM 9-1240-379-34
MARINE CORPS TM 04332A-34
8
Check numerical engraving on elevation
10 Replace any damaged, missing, or
broken parts. See TM 9-1240-379-
and deflection knob assemblies slip
34P.
9
Clean optical surfaces in accordance
with TM 9-254.
REASSEMBLY
1 Install assembled lampholder plug (1) in
grooved recess of elevation boresight
cover assembly (2).
knob assembly (6).
2 Install cover assembly (2) and secure
5 Hold
elevation boresight knob assembly
(6)
and
turn knob so that adjuster blade (8)
machine screws (4).
just
touches reticle housing.
3 Apply a light coat of grease to new
NOTE
preformed packing (5).
If adjuster blade (8) extends
too far, the spring tension of
NOTE
the reticle will force the eleva-
The main difference between
tion boresight knob assembly
the elevation and deflection
outward.
boresight knob assemblies is
the way that the numbers
6 Install four machine screws (9),
face. See illustration above.
and tighten.
4 Install new preformed packing (5) into
2-31