TM 9-1240-285-34&P
3-2.
INSPECTION UPON RECEIPT (CONT)
Reference
Step
Procedure
Maintenance Action
1.
Check identification plate ( 1 ) can
Tell your supervisor.
...
be read.
Replace if missing or not
Check decals (2) are in place and
2.
readable.
can be read.
3.
Replace worn part(s) on
Check that elevation and deflection
elevation or deflection
boresight mechanisms (3) will not
locking mechanism.
turn when lock levers (4) are in
locked position.
4.
Check that elevation and deflection
Replace worn part(s) on
and 4-13
boresight mechanisms (3) do not
elevation or deflection
boresight mechanism.
bind when lock levers (4) are in
unlocked position.
Tighten. Replace if
...
5.
Using 9/ 16" box wrench, check
missing.
that two screws (5) are tight.
Stake, if not staked.
Check that pin (6) is staked at
6.
both ends.
GO TO FRAME 3
3-4
Vol II