TM 9-1240-262-34&P
KD
- A n item of a depot overhaul/
Definition
Code
r e p a i r kit and not purchased
Depot kit defined
separately.
-Item procured and stocked
PA
a s a kit that provides items
f o r anticipated or known usage.
r e q u i r e d at the time of
o v e r h a u l or repair.
- I t e m procured and stocked for
PB
KF
e s s e n t i a l i t y dictates that a
-An item of a maintenance kit
and not purchased separately.
minimum quantity be available
Maintenance kit defined as
in the supply system.
a kit that provides an item
t h a t can be replaced at
-Item procured and stocked and
PC
organizational or intermediate
which otherwise would be coded
l e v e l s of maintenance.
P A except that it is
deteriorative in nature.
KB
-Item included in both a depot
o v e r h a u l / r e p a i r kit and a
PD
- S u p p o r t item, excluding support
m a i n t e n a n c e kit.
equipment, procured for initial
MO
-Item to be manufactured or
o n l y for subsequent or
fabricated at organizational
additional initial issues or
level.
N o t subject to
Outfitting.
a u t o m a t i c replenishment.
MF
-Item to be manufactured or
fabricated at the direct
PE
-Support equipment procured
s u p p o r t maintenance level.
a n d stocked for initial issue
MH
-Item to be manufactured or
f a b r i c a t e d at the general
s u p p o r t maintenance level.
PF
-Support equipment which will
not be stocked but which will
MD
-Item to be manufactured or
b e centrally procured on
f a b r i c a t e d at the depot
demand.
q aintenance level.
-Item procured and stocked to
PG
AO
-Item to be assembled at
p r o v i d e for sustained support
organizational level.
f o r the life of the equipment.
I t is applied to an item
p e c u l i a r to the equipment
AF
- I t e m to be assembled at direct
w h i c h , because of probable
s u p p o r t maintenance level.
discontinuance or shutdown
o f production facilities, would
-Item to be assembled at general
AH
prove uneconomical to reproduce
s u p p o r t maintenance level.
a t a later time.
C-2