CHAPTER 7
PROCESSING AND PACKAGING
7-1. General
7-3. Final Packaging of Periscope XM47
After the components of periscope XM47 have been
Final packaging of periscope XM47 shall be in
repaired,
inspected,
declared
serviceable
and
accordance with MIL-P-14232/P8589700, packaging
reassembled, the processing and packaging procedures
level "A" and packing level "C."
of this chapter should be followed to assure that
serviceability will be maintained.
7-4. Final Packaging of Mount Assembly and Seal
Assembly
7-2. Optical Components
Final packaging and packing, level "C", shall be MIL-
Cover all prisms or optical elements with at least four
P-14232/P10513443 for the mount assembly and MIL-P-
thicknesses of neutral lens tissue and secure in place
14232/P10513439 for the seal assembly.
with water-resistant, pressure-sensitive adhesive tape.
Cover the lens tissue with cellulosic cushioning materiel
7-5. Final Packaging of Washer, Pump and Reservoir
and secure in place with pressure-sensitive tape.
Assembly and Wiper Assembly.
Final packaging and packing, level "C" shall be MIL-
P-14232/P8589793 for the washer, pump and reservoir
assembly and MIL-P-14232/P10513436 for the wiper
assembly.
7-1