TM 9-1240-415-13&P
0006 00
OPERATING PROCEDURES Continued
NOTE
NOTE
Each click of the zeroing adjustments makes a 2.5mm
movement of the point of impact at 10m.
4.
Make final adjustments as follows:
a.
To move the point of impact to the right, turn windage adjustment
dial (3) counterclockwise with the arrow marked on the dial.
b.
To move the point of impact to the left, turn windage adjustment
dial (3) clockwise opposite to the arrow.
c.
To move point of impact up, turn elevation adjustment dial (2)
counterclockwise (right) in the direction of the arrow and UP
marking.
0006 00-6