TM 9-1240-262-34&P
CHECKOUT PROCEDURE
SCOPE
Checkout of the M105D and M105F Articulated Telescopes is done by using the flowchart procedures in
this chapter. You must do the checkout procedure from the beginning until a fault symptom is found.
When it is, go to the fault symptom index in Chapter 3. After you have corrected the fault, start at the
beginning again and do the checkout procedure until the telescope is working correctly.
CHECKOUT (SHEET 1 OF 8)
TEST EQUIPMENT: Light source control
0-36 VDC power supply
PERSONNEL: One
REFERENCES: JPG 41C for Connecting power supply
Cleaning
Lubricating
Checking for parallax
EQUIPMENT CONDITION: Telescope on work bench
PRELIMINARY PROCEDURES: Do inspection upon receipt (Vol II, para 3-2)
Vol I