TM 9-1240-216-34
2-2. CHECKOUT (SHEET 3 OF 6)
LOOSEN ELEVATION
SETTING LEVER
(1).
SWING PERISCOPE
(ON MOUNT) OR
MOVE ELEVATION
LOCK ASSEMBLY
SEGMENT (2) (ON
WORK BENCH) UNTIL
IT STOPS.
CHECK MOVEMENT.
MOVES
SMOOTHLY
SYMPTOM 2
TIGHTEN ELEVATION
SETTING LEVER
(1).
TRY TO MOVE
PERISCOPE (ON
MOUNT) OR
ELEVATION LOCK
ASSEMBLY SEGMENT
LOCK TIGHT
(2) (ON WORK
BENCH) TO CHECK
FOR TIGHT LOCK.
SYMPTOM 3
Para 2-2 (Sheet 3 of 6)
2-3
Vol I